Real Offshore Challenges Solved With Local, Reliable, Renewable Power
See where Mocean’s system is deployed, validated, and supporting offshore operations today.


Built for the Realities of Offshore Operations
Every offshore environment brings unique constraints—from power demand and water depth to access, metocean conditions, and operational risk. Mocean’s system is built to perform across this variability: depth-agnostic, integrated with subsea equipment and complementary technologies, and configurable for different duty cycles and redundancy needs. Survivability, reliable power, and communications uptime are proven through real offshore deployments.
.webp)
How the System is Applied

Use Cases
Our system provides local power and communications for remote offshore equipment such as actuators and sensors. Applications include long-lifetime greenfields and CCS developments, as well as retrofit solutions for shut-in and stranded offshore assets. The same capability supports a growing range of Blue Economy applications where reliable offshore power is required.
.png)
Case Studies
We have demonstrated reliable local offshore power generation and provision through extended time at sea, including deployments with Northwest European Wave Energy Test Centre and Renewables for Subsea Power. Operational insight from these projects continues to inform system development and readiness for commercial deployment.
.png)
Pilot Projects
An upcoming EuropeWave deployment will validate key system upgrades including power take-off, communications, and survivability. Planned programmes with OceanREADI and OceanPULSE will expand data collection and further extend operational capability toward commercial deployment.
.png)
Industry Recognition and Publications
Our technology has been recognised through competitive procurement programmes and integration within first-of-a-kind offshore demonstrations such as Renewables for Subsea Power. We contribute to industry and academic knowledge through regular peer-reviewed publications and technical papers.
Why Localised Offshore Power
Eliminates Long Cables
Avoids costly, fragile subsea cables laid over tens to hundreds of kilometres from shore or host facilities.
Reduces Cost Exposure
Power costs no longer scale with distance, route complexity, or seabed conditions.
Cuts Offshore Intervention
Fewer installation campaigns, vessel days, and maintenance operations offshore.
Removes Host Dependency
Local power reduces reliance on existing platforms and infrastructure constraints.
.webp)
Ideas, Research, and Perspectives
North Sea Deployment
Our initial 5-month offshore campaign validated power capture and survival behaviour, confirmed remote communications and autonomous operation, and successfully demonstrated execution of both onshore and offshore activities.
Engineering trust through transparency
How dashboards, reporting, and accountability mechanisms create stronger client relationships.

.webp)
Engineering trust through transparency
How dashboards, reporting, and accountability mechanisms create stronger client relationships.
RSP Project
13-month provision of power and communications to an offshore micro-grid, integrating subsea equipment, a subsea battery, and a resident AUV to enable continuous, autonomous operation.
.webp)

OceanPULSE Pilot
Expanding system functionality and operational envelopes, validating global applicability through deployment alongside turn-key subsea electrification solutions.
Engineering trust through transparency
How dashboards, reporting, and accountability mechanisms create stronger client relationships.


Engineering studies
How dashboards, reporting, and accountability mechanisms create stronger client relationships.
Engineering Studies
Operator-commissioned engineering studies assess feasibility and quantify techno-economic impact. Working independently or with Tier 1 partners, these studies generate the insight needed to solve electrification and integration challenges, unlock projects, and advance combined offerings.

Designed to be Reused Across Multiple Locations and Projects.
Static cables have long lead times, require trenching, and are a one-off sunk cost. Mocean Energy’s system can be refurbished and redeployed beyond the first project, depending on the required operational lifetime. This unlocks future developments and extends techno-economic impact, bringing significant added value.

Ready to connect
Whether you’re exploring options or advancing a project,
we work alongside you to assess fit, share insight, and support next steps.

.webp)